Example: checked on 1 Nov 2026, 30-day claim window, 15-day settlement cycle
- ORD-1001: return on 08/10/2026, 24 days ago, so 6 days left to claim ₹1,200.
- ORD-1002: return on 20/09/2026, 42 days ago — past the window, ₹900 lost.
- ORD-1003: delivered 27 days ago, ₹850 still not settled — overdue.
- SKU-WT-01: actual 0.45 kg, volumetric 0.48 kg, billed 1 kg on 0.5 kg slabs: 1 extra slab × 200 shipments × ₹40, plus the share that came back = ₹9,600.
- SKU-BOX-02: box 25 × 20 × 9 cm = 0.9 kg volumetric, billed 1.4 kg: overcharge ₹24,000.00, or ₹28,320.00 including GST at 18%.
Leakage ₹36,550: ₹35,650 recoverable, ₹900 past the window.